Skip to main content
C

Master Scheduler

ColonialWebb
8 hours ago
Full-time
On-site
Greater Richmond Region, United States
LinkedIn

Title: Master Scheduler/Capacity Planner Reports To Department: Manufacturing Classification: Non-Exempt Compensation: $85,000/yr. Date Updated: July 2026 Summary The Master Scheduler is responsible for developing, maintaining, and executing the Manufacturing Production Scheduling System (MPSS) that aligns customer demand with labor capacity and manufacturing constraints in a trade-driven manufacturing environment. This role serves as the central planning authority across shop, field, project, and supply chain functions, ensuring fabrication work is sequenced, resourced, and released in alignment with project milestones and field installation requirements. Operating without formal planning software, the role relies on structured Excel-based tools, disciplined planning processes, and close coordination with Shop Operations, Field Teams, Inventory Planners, Fabrication Planners, Virtual Construction (VDC), and Project Management. Core Values This position will be expected to operate in line with ColonialWebb’s workplace values, which are: Safety: Makes the prevention of injuries and vehicle incidents his/her number one priority Integrity: Is truthful and honest in words and actions Empathy: Understands and appreciates his/her customers’ or teammates’ positions Urgency: Gives immediate attention to important tasks without compromising safety Essential Functions Own and maintain the Manufacturing Production Scheduling System (MPSS) for all active work orders, fabrication packages, and projects. Translate backlog and incoming demand into a time-phased, trade-based production and release schedule. Sequence and prioritize fabrication work based on customer commitments, project milestones, field installation requirements, trade availability, workflow constraints, and material readiness. Continuously adjust schedules to reflect priority changes, engineering and VDC revisions, material shortages, and labor disruptions. Develop and maintain capacity models by trade and identify bottlenecks, overloads, and schedule risk. Recommend mitigation actions including resequencing work, overtime, subcontracting support, or schedule realignment. Act as the single source of truth for manufacturing schedule commitments and capacity visibility. Coordinate closely with team leads, skilled trades, Inventory Planners, Fabrication Planners, Field Teams, VDC, Project Management, Procurement, and Engineering. Participate in production scheduling, project coordination, and field look-ahead meetings. Align fabrication sequencing with model completeness, inventory readiness, fabrication plans, and field installation order. Additional Responsibilities Build and maintain Excel-based planning and capacity modeling tools. Establish and sustain planning cadences aligned with manufacturing execution and field look-ahead cycles. Define and refine planning assumptions using actual production performance. Support continuous improvement related to planning accuracy and schedule stability. Perform other duties as assigned. Requirements Experience: Minimum of 3 years of planning, scheduling, or production control experience. Education: Bachelor’s degree in Operations, Engineering, Supply Chain, or equivalent experience preferred. Skills 1. Strong understanding of trade-based manufacturing and fabrication workflows. Advanced Excel skills including labor modeling, scenario analysis, and dashboards. Ability to plan effectively without automated scheduling software. Strong communication and cross-functional coordination skills. Ability to balance competing priorities and make decisions with incomplete data. Miscellaneous Work location: ColonialWebb Manufacturing Shop Schedule: Full-time, Monday through Friday. Occasional evening and weekend work may be required as duties demand. Unscheduled overtime may be required, as necessary Physical Requirements The physical demands described here are representative of those that must be met to successfully perform the essential function…

View the full posting and apply