Sr. Manager, Piping & Plant Layout
NextDecadeIt's fun to work in a company where people truly BELIEVE in what they're doing! We're committed to bringing passion and customer focus to the business. JOB SUMMARY NextDecade is seeking a Senior Manager, Piping & Plant Layout to join our multi-discipline Engineering and Construction team which is responsible for executing the Rio Grande LNG (RGLNG) project and supporting all project development activities. This role serves as NextDecade’s Owner technical authority for piping engineering, piping materials, pipe stress and plant layout. The EPC Contractor owns execution of the piping design; this role provides Owner oversight, technical assurance, challenge and acceptance recommendations across FEED, detailed design, procurement, fabrication, construction, commissioning, startup and early operations, ensuring the plant is safe, operable, maintainable and constructible and that design and execution adhere to specifications, codes and schedule. This role leads NextDecade’s Owner piping, layout and stress team, sets the Owner review strategy and priorities for the discipline, and is the escalation point for piping-related technical, schedule and quality issues with the EPC Contractor and NextDecade leadership. KEY RESPONSIBILITIES Serves as NextDecade’s Owner technical authority and subject matter expert for piping engineering, pipe stress and plant layout during FEED, detailed engineering, procurement, construction, commissioning, startup and early operations of NextDecade projects. Leads, mentors and develops a team of Owner piping, plant layout and stress engineers and field piping representatives; sets priorities, assigns reviews and ensures consistent, high-quality technical output. Establishes and maintains Owner piping/layout procedures, review plans, acceptance criteria and technical decision authority, and approves or recommends disposition of piping-related deviations, concessions and technical queries. Supports contracting strategy, EPC bid technical evaluations and contractor scope/coordination procedures for piping, layout, stress, materials and fabrication. Monitors and reports EPC piping performance to Engineering leadership, including model and isometric progress, MTO and bulk material status, spool fabrication, installation, test package completion and turnover, and drives corrective action where performance lags. Provides technical oversight of EPC Contractor piping, layout and stress engineering, piping procurement and construction activity, and identifies design maturity, schedule, procurement or construction risks requiring Owner intervention. Reviews and challenges critical pipe stress analyses performed in CAESAR II, including sustained, thermal, occasional (wind, seismic, relief reaction, slug/transient) and settlement loads, equipment nozzle loads, supports/restraints and spring supports, to verify compliance with ASME B31.3 & B31.8 and applicable equipment standards. Leads Owner reviews of overall site and unit plot plans and 30%, 60% and 90% 3D model reviews, evaluating safety, operability, maintainability, constructability, access/egress, valve operability, equipment removal envelopes, crane access, drainability/ventability and piping routing. Reviews piping material specifications and piping classes, valve and specialty item specifications, insulation specifications, material substitutions and deviations, including low-temperature material selection, flange ratings, gaskets, bolting, PWHT, PMI and NDE requirements. Provides technical oversight of LNG and cryogenic piping systems, including thermal contraction, cooldown, insulation and vapor barriers, cold shoes/insulated supports and cryogenic valve arrangements. Reviews and verifies thermal bowing assessments for cryogenic lines (e.g., stratified or two-phase flow during cooldown and partial-fill conditions) and confirms appropriate design and operating mitigations, such as support/guide arrangements, cooldown rate limits and procedur…