Production Planner / Master Scheduler
Dynamic SystemsPosition summary
Dynamic Systems (DSI), LLC, a Quanta Services company, is a mechanical contractor delivering HVAC and plumbing systems for mission-critical facilities. Our Division 440 Off-Site Manufacturing (OSM) group builds modular mechanical assemblies skids, racks, headers, and prefabricated piping and equipment modules in a controlled fabrication facility for installation on data-center an
...
d industrial projects.
The Production Planner / Master Scheduler owns the plan for what the OSM floor builds, in what sequence, and when it leaves the building. This is a production planning and control role, not a floor-supervision role. The Floor Manager owns how the work gets built and who builds it; this position owns what enters the line, when it enters, and where finished product goes. The two roles run the floor together and report to the same division leader.
The right candidate has lived inside a make-to-order or engineer-to-order manufacturing operation where every unit is different, drawings arrive late, and delivery dates move and has kept a multi-customer production schedule honest under those conditions.
Key responsibilities
Build, own, and maintain the master production schedule across all active OSM jobs, converting project delivery dates and field install sequences into a station-by-station, week-by-week build plan.
Sequence and release work to the line based on delivery commitments, engineering/drawing status, material and equipment availability, and station capacity; re-level the plan when any of those move.
Run capacity planning: forecast labor-hours, station load, and floor space by week and by job; flag overloads and gaps 48 weeks out so staffing and overtime decisions are made ahead of time, not after the fact.
Own the material readiness gate: coordinate with procurement, detailing/BIM, and vendors so that drawings, BOMs, and kitted material are staged before a