NY Construction Scheduling Lead
MicronOur vision is to transform how the world uses information to enrich life for all.
Micron Technology is a world leader in innovating memory and storage solutions that accelerate the transformation of information into intelligence, inspiring the world to learn, communicate and advance faster than ever.
The US Expansion Construction team leads the design and construction of Micron's high-tech, larg
...
e-scale manufacturing projects across the United States. Our portfolio includes two HVM manufacturing facilities in Boise, Idaho, ID1 and ID2, as well as a greenfield manufacturing facility in Clay, New York. We are building the infrastructure that will support the future of semiconductor manufacturing in the US!
As the NY Construction Scheduler, you will play a key role in the successful delivery of our significant New York Megafab. You will provide schedule leadership across a complex construction environment, integrating project activities, identifying risks, and providing clear reporting and recommendations to Construction leadership and the Project Management team.
Responsibilities:
• Lead the development, maintenance, governance, and analysis of coordinated mid-level and detailed construction schedules, including baselines, critical paths, breakthroughs, constraints, forecasts, and schedule health metrics
• Drive Facilities Readiness schedule integration across Base Build, CSA, Systems, Commissioning, Startup, and equipment setup to support turnover and operational readiness
• Lead contractor timetable assessments, evaluate schedule logic and performance against approved baselines, and drive mitigation and recovery planning for schedule variances
• Perform critical path, what-if, fragnet, and Time Impact Analysis (TIA) assessments to evaluate risks, changes, delays, claims, and recovery strategies
• Provide concise schedule reporting, dashboards, forecasts, and executive-level recommendations while partnering with Engineering, Procurement, Construction, Commissioning, Operations, and Project Management teams
Minimum Qualifications:
• Bachelor's degree or equivalent experience in Engineering, Construction Management, Architecture, or a related technical field
• 8-10 years of project scheduling, planning, or project controls experience supporting large capital construction projects
• Advanced proficiency with Primavera P6, Critical Path Method (CPM) scheduling, and development and management of Level 3 and Level 4 schedules
• Experience leading contractor schedule reviews, critical path and schedule risk analysis, forecasting, and efforts to bring projects back on track
• Knowledge of schedule impact evaluations, delay analysis, schedule-related claims, and schedule effects resulting from project changes or disruptions
Preferred Qualifications:
• Experience supporting EPC, EPCM, Design-Build, or other project delivery models
• Experience with large-scale semiconductor, manufacturing, data center, industrial, or infrastructure construction programs
• Experience integrating construction, commissioning, startup, Facilities Readiness, and tool installation schedules
• Experience translating schedule data, risks, and trends into actionable recommendations for project and executive leadership
• Experience using AI tools to accelerate project reporting, schedule analysis, or executive-level insights
The US base salary range that Micron Technology estimates it could pay for this full-time position is:
$136,000.00 - $230,000.00 a year
Additional compensation may include benefits, bonuses and equity.
Our salary ranges are determined by role, level, and location.The range displayed on each job posting reflects the minimum and maximum target base pay for new hire salaries of the position across all US locations.Within the range, individual pay is determined by work location and additional job-related factors, including knowledge, skills, experience, tenure and relevant education or training. The pay scale is subject to change depending on